Home Matt Grasson

Matt Grasson

No Coolant Needed

With nearly 3,500 F-35s still scheduled for production during the life of the Joint Strike Fighter program, it is imperative to look at every aspect of the manufacturing process to reduce costs while ensuring a high level of quality. That is exactly why a team from Lockheed Martin Aeronautics, the Enterprise Drilling Center of Excellence […]